On an FPSO Vessel, Obstacles Are Cast Overboard
Champion and Petrobras operate a platform on an FPSO vessel (Floating Production, Storage and Offloading unit) in the Campos Basin off southeastern Brazil. An existing pneumatic pump system, which had operated for about five years, pumped paraffin inhibitor. Problems and repairs occurred very frequently, and the associated maintenance expenses and spare-parts supply became troublesome and costly.
CheckPoint Pumps and Systems provided a solution to address the obstacles faced by Champion and Petrobras. The units were to be located in the FPSO’s mooring turret, which had very limited designed space. H2S (hydrogen sulfide) scavenger replaced the paraffin inhibitor, and ten different injection points needed to be supplied by ten pumps. These pumps were required to inject the chemical at 100 LPH (24 GPH) at pressures up to 185 kg/cm² (2700 psig).
CheckPoint Engineered Solutions designed an arrangement of five stacked skids, with three lower skids supporting two upper skids. This ten-pump configuration enabled rapid installation on site. Each two-pump skid could also be positioned independently anywhere on the vessel, providing maximum flexibility for future operations.
Each skid contained all components needed for optimal pump operation, plus pressure monitors and pulsation dampeners for a constant chemical supply, critical for H2S scavenging. CheckPoint supplied the complete system 39 working days after the order.
Ultimately, CheckPoint Pumps and Systems designed an effective, rapid, high-quality solution that met Champion’s and Petrobras’ needs.
Engineered Pneumatic Chemical Pump Systems
- Design Configured for the Customer
- Small Footprint
- 10 independent injection points