On an FPSO Vessel, Obstacles Are Cast Overboard
Champion and Petrobras operate a platform on an FPSO vessel (Floating Production, Storage and Offloading unit) in the Campos Basin off southern Brazil. A pneumatic pump system pumped paraffin inhibitor there for five years. Breakdowns and repairs occurred far too frequently, and maintenance and spare-parts costs became excessively troublesome and expensive.
To resolve these issues, CheckPoint Pumps & Systems offered a solution to Champion-Petrobras’ continuing problems. The units were to be positioned in the FPSO vessel’s turret, which had very limited space. The paraffin inhibitor system was to be replaced with an H scavenger system2S, requiring ten injection points supplied by ten pumps delivering chemical at 100 LPH (24 GPH) against pressures up to 185 kg/cm2 (2700 PSIG).
CheckPoint’s solution consisted of five stackable skids: three along the base supported the two above. This ten-pump stacked configuration enabled quick placement at the operating location. Each two-pump skid could also be positioned independently anywhere on the vessel, offering maximum flexibility for future operations.
Each skid contains all components needed for optimal equipment operation, plus pressure monitors and pulsation dampeners for a stable chemical supply, crucial in procedures involving chemicals such as H scavengers2S. CheckPoint was able to deliver the complete system in just 39 working days from the order.
Ultimately, CheckPoint Pumps & Systems successfully designed an effective, rapid, high-quality solution meeting Champion and Petrobras’s needs and requirements.
Specially Designed Pneumatic Pump Systems
- Special Design
- Reduced Equipment Footprint
- Ten Independent Injection Points









